nubader-logo

Our Contacts

AL-Mansour/Baghdad-Iraq/Sec. 609 – st. 35 – villa 26

0783 302 7460

Midland Oil Company – Al-Kut                             

Client: Midland Oil Company.

Installation Site: Al-Kut.

Location: 44.400224,33.335912

System Size: 12.8 KW .

Date of installation : April – 2021

System Type: Hybrid Solar A/C System.

The number of air conditioners: 8 integrated solar air conditioning system